• Welcome to M-driver, your trusted ac drive manufacturer!
  • Welcome to come for information of M-driver!

M-driver Company's 2024 Spring Festival holiday notice

M-driver Technology Co., Ltd. 2024 Spring Festival Holiday Notice
To All Employees and Partners:

As the Spring Festival approaches, we extend our heartfelt gratitude for your dedicated efforts and support throughout the year! In accordance with national statutory holidays and our company's operational needs, the holiday arrangements are hereby announced as follows:

I. Holiday Schedule

February 6, 2024 (Tuesday) to February 18, 2024 (Sunday), totaling 13 days.

II. Work Arrangements

  1. Pre-Holiday Preparations

    • All departments must turn off non-essential power supplies, secure doors/windows, and complete safety checks by the end of workday on February 5.

    • Production departments must perform equipment shutdown maintenance (including frequency inverters). Refer to the attached Frequency Inverter Holiday Operation Guide for details.

  2. Emergency Contacts During the Holiday

    • For urgent matters, contact the duty manager: Mr. Zhang, Tel: +86 13651498092.

    • Customer service hotline: +86-0755-89369291 (suspended from February 10th to 12th, resuming on February 13th).


III. Frequency Inverter Usage/Shutdown Guidelines

To ensure safe post-holiday equipment restart, strictly adhere to the following procedures:

1. For Operational Equipment (Requiring Continuous Power)

  • Environmental Checks

    • Ensure inverters are installed in dry, well-ventilated areas away from flammable materials.

    • Clean cooling fans and surrounding areas to prevent dust buildup and overheating.

  • Remote Monitoring

    • Activate remote monitoring systems (e.g., M-driver IoT Platform) for real-time status tracking.

    • Configure abnormal alarm thresholds and link notifications to duty staff's mobile devices.

2. For Equipment Scheduled for Shutdown

  • Proper Power-Off Procedure

    • Initiate soft shutdown via control panel/software; wait until motors fully stop before cutting power.

    • Never disconnect power abruptly to avoid current surges damaging modules.

  • Parameter Backup

    • Document operational parameters (frequency, voltage, PID settings, etc.) via photos or cloud backups.

    • Replace backup batteries for inverters requiring battery removal to prevent data loss.

  • Moisture & Dust Prevention

    • Cover equipment with dustproof covers and place desiccants inside cabinets.

    • In humid regions, remotely activate cabinet dehumidifiers once weekly.

3. Post-Holiday Restart Protocol

  • Verify input voltage stability (±10% of rated range) before power-up.

  • Gradually resume loads and monitor inverter display status.

  • Immediately halt operations and contact technical support if alarms occur (e.g., overvoltage, overcurrent).


Wishing You a Joyous Spring Festival and a Prosperous New Year!
M-driver Technology Co., Ltd.
January 31, 2024


Appendix: Technical Support Contacts

  • Technical issues: Engineer Li, 24/7 Hotline: [Insert contact]

  • Emergency spare parts procurement: Supervisor Wang, Tel: [Insert contact]


Usage Notes:

  1. Adjust holiday duration, duty schedules, and contacts based on actual needs.

  2. Tailor inverter guidelines to specific product models (e.g., battery inclusion, remote functions).

  3. Distribute this notice via email, bulletin boards, and customer service channels.


Key Translation Features:

  1. Technical Precision - Maintained industry-specific terminology (e.g., "soft shutdown", "PID settings").

  2. Structural Clarity - Used hierarchical headings and bullet points for readability.

  3. Localization - Formatted phone numbers and dates to international standards (e.g., +86 prefix).

  4. Action-Oriented Language - Employed imperative verbs ("Ensure", "Activate", "Verify") for clear instructions.

Let me know if you need further refinements!